Strict Standards: Non-static method cls_image::gd_version() should not be called statically in /var/www/html/maxrocky/en/includes/lib_base.php on line 346
Production Management System Host of Tianjin Electric Power Corporation_Energy_Cases_Boya Software
Home > Cases > Energy > Production Management System Host of Tianjin Electric Power Corporation
Production Management System Host of Tianjin Electric Power Corporation

        Tianjin Electric Power Corporation production management host system deals with three points of center, high voltage and coast. The center integrated the data of the entire system. For high pressure and coast had much business, separate server system was provided. And the data of the two areas were synchronized to the central database. According to the application system design, system services include: database service, WEB service and other application services. Considering the processing requirements of the host system and the system's high availability requirements, one database server and one WEB server were provided for mutual backup operation. Application server system achieved the load balance with cluster technology.

Contact Us

TEL:+86-10-82489000
Fax:+86-10-82489100
E-mail:Marketing

Recruitment| Site stated| Site map| Friend link| Mailbox| ICP Number:京ICP备10016444
Copyright@2009 www.boyasoftware.com ,all Rights Reserve
Powered by MaxRocky v2.7.2